Tesla produced its first Cybertruck off the assembly line in Austin, Texas, over the weekend after two years of delays. The first Cybertruck finally rolled off the factory line on July 15 to much celebration at Tesla’s Gigafactory.
Tesla CEO Elon Musk first announced the first prototype of the electric pickup truck back in 2019 to great fanfare. But in the years since Musk unveiled his Cybertruck, Tesla had delayed the mass production of the electric vehicle (EV) multiple times.
The EV manufacturer initially expected production to begin in late 2021, but it witnessed delays due to supply chain issues.
Cybertruck Delayed Due to Supply-Chain Problems
The Cybertruck is designed with a wedge-shaped stainless-steel body that gives it a sleek and futuristic-looking design. The electric pickup, though, has undergone some design changes since it was first announced….
RSS Feed | The Epoch Times
